Tucker HiRise - 1 Bloor East Elevator Pit Toronto, ON

Tucker HiRise was looking to address the issue of adverse soil and water conditions resulting in cave-ins while trying to advance an excavation in preparation for the building of a high-rise condominium.  Hardrock was contracted address the need for soil stabilization.  The project involved the installation of 4” of shotcrete to excavated bank of elevator pit foundation to stabilize the open cut excavation.

Tucker HiRise construction site using shotcreteTop down view of Tucker HiRise siteTucker HiRise after shotcrete application

For more images of this project please click here to visit the Gallery