Go Transit: Tunnel, Toronto, ON

Hardrock was hired to consult and oversee shotcreting of two utility shafts and a utility tunnels for Go Transit and CN Rail. The contractor ended up hiring Hardrock as shotcrete contractor and we carried out the shotcrete portion of the project.  The shafts were approximately 100 feet deep and the tunnel was 543 feet long.

For more images of this project please click here to visit the Gallery

Back