Conveyor Pit, Brampton, ON

Hardrock was hired to design and build a soil retaining structure for a 30 ft deep conveyor belt pit.  We excavated the pit and fabricated and installed structural I-beams.  All steel fabrication and welding was done by Hardrock.  We then installed all structural steel and rebar and shot a 300mm layer of shotcrete on all surfaces of the pit.

For more images of this project please click here to visit the Gallery